Millbay Plot A1, Plymouth

Building DesignEnvironmental NoiseOn-Site TestingNumerical Modelling

Millbay Plot A1, Plymouth

The scheme involves the construction of 102 residential units in 9 No blocks in a quayside location on a brownfield site in Plymouth. The blocks are built using a variety of construction techniques including concrete frame, timber frame, traditional masonry and pre-cast products.

Red Twin Limited were appointed by the main contractor Kier Construction to provide a full acoustic design service which include assistance to satisfy the noise related planning conditions for internal noise, assistance with the design to achieve suitable sound insulation between dwellings to achieve the Code for Sustainable Homes Level 3 standard on acoustics, assistance during construction, and pre-completion acoustic testing.